Goldenhill , Manor Kilbride , Co. Wicklow
alterations and extensions to existing workshop, consisting of plant room to front elevation and entrance lobby to rear elevation and storage space and toilets in attic space and all ancillary site works
Wicklow County Council · latest application received 19/11/2026
alterations and extensions to existing workshop, consisting of plant room to front elevation and entrance lobby to rear elevation and storage space and toilets in attic space and all ancillary site works
alterations and extensions to existing workshop, consisting of plant room to front elevation and entrance lobby to rear elevation and storage space and toilets in attic space and all ancillary site works
change-of-use from the approved creche ( Reg Ref. No. 13/8179) to a new guiding activity centre at Beechlawn, Corballis Upper, Rathdrum, County Wicklow, A67 PX53. The proposed alterations will consist of a new internal layout to include sleeping accommodation, dining and sanitary facilities, administration office and activity and craft rooms, and external alterations to the existing two-storey structure at the roof, external doors and windows. Ancillary siteworks will include alterations to the private surface water and foul drains connections to the existing outfall to the public sewer, and re-design of the main site entrance and vehicular drive-in and on-site parking facilities
the change of use of an existing two-bedroom ground-floor apartment to short-term letting accommodation. The application relates solely to the retention of the established short-term letting use, with no physical alterations or construction works proposed
change of use from first floor offices to 2-bedroom apartment, together with all associated ancillary works to facilitate the above at No 90 Main Street, Bray, Co. Wicklow
demolition of an existing outbuilding and boiler shed, and the proposed construction of a two story outbuilding, comprising a private domestic gym, games room and bedroom accommodation, and single storey garage and store, together with all associated site works
demolition of an existing outbuilding and boiler shed, and the proposed construction of a two story outbuilding, comprising a private domestic gym, games room and bedroom accommodation, and single storey garage and store, together with all associated site works
change-of-use from the approved creche ( Reg Ref. No. 2013/8179) to a new guiding activity centre at Beechlawn, Corballis Upper, Rathdrum, County Wicklow, A67 PX53. The proposed alterations will consist of a new internal layout to include sleeping accommodation, dining and sanitary facilities, administration office and activity and craft rooms, and external alterations to the existing two-storey structure at the roof, external doors and windows. Ancillary siteworks will include alterations to the private surface water and foul drains connections to the existing outfall to the public sewer, and re-design of the main site entrance and vehicular drive-in and on-site parking facilities
demolition of an existing outbuilding and boiler shed, and the proposed construction of a two story outbuilding, comprising a private domestic gym, games room and bedroom accommodation, and single storey garage and store, together with all associated site works
development at a 0.174 ha site at Powerscourt Estate, Enniskerry, Co. Wicklow, which is in the curtilage of a protected structure (Powerscourt House). The development will consist of the redevelopment of three existing single storey farmyard buildings. The development of two farmyard storage buildings (c. 283 sqm) will consist of works including the subdivision of existing stores, new concrete floors, new façade cladding and roof finishes including skylights; and elevational changes to include new doors and screens to existing and new openings within the new facades. The development of one building will consist of the change of use from ancillary farmyard use to office use (c. 340 sqm) comprising studio space, meeting rooms, production and flexible working spaces, and ancillary staff facilities. Works will comprise of the upgrade of existing building fabric, subdivision of spaces, and elevational changes including new glazed doors and screens to existing openings. All associated site development works including piped services connection to existing services with new permeable surface to existing courtyard, car parking to be accommodated in the existing public car park