Kildare Co Co2661288Received 19/11/2026PERMISSIONSubmissions ~28d left

Easton Townland , Collinstown , Leixlip

for the construction of a three-storey Primary Care Centre building to provide services such as general primary care, mental health, disability and older person services (gross floor area 3,162 sq m). The building will accommodate GP rooms, treatment and consultation rooms, primary care administrative offices, pharmacy (149 sq m), retail unit (127 sq m), and ancillary accommodation including staff facilities, offices, meeting rooms, reception and waiting areas, ESB substation and plant. The development will be accessed via a proposed signalised junction with the R449 Regional Road including the provision of right-turning lanes and bus stops on both sides of the R449. Car parking will be divided into a dedicated staff car park and a visitor car park with both to be controlled by barrier access and a total of 92 car parking spaces. A services connection is proposed to existing services on the western edge of Westfield estate, to the east of the site. The proposal also includes 48 bicycle parking spaces, service building and ancillary delivery area, drainage, PV panels at roof level, signage, landscaping, boundary treatment and all associated site works and services, all on a site area of 2.85 ha.

Commercial & fit-outSite & groundworksRoofing, windows & externalEnergy: solar, batteries & grid+1
Kildare Co Co2661273Received 17/11/2026PERMISSIONSubmissions ~26d left

Tully Road , Tully East , Kildare

the proposed green energy initiative development consisting of a ground mount installation of Photovoltaic Panels together with all associated site works

Energy: solar, batteries & grid
Kildare Co Co2661264Received 13/11/2026PERMISSIONSubmissions ~22d left

American Fruits and Flavors Ireland DAC , Townparks Industrial Estate , Athy

1. The construction of a logistics warehouse building (with a part first floor area) to service the existing industrial operation, dock leveller loading and unloading facilities, ancillary, two storey staff offices with showers, changing rooms and toilets and a screened, roof top plant area. The warehouse has internal plant and equipment rooms; roof mounted solar panels; and EV charging for Heavy Goods Vehicles; fire access road; service yards and loading docks and cycle parking. The logistics warehouse building has a gross floor area of circa 21,458sqm and a height of circa 14.85m. 2. Construction of a security building circa 27sqms; 3. Construction of a new sprinkler tank and water tank with a pump house which has a gross floor area of circa 227sqm and an underground fire water containment tank; 4. Construction of an MV switch room of circa 21sqms; 5. Construction of a Recovery and Recycling Unit (RRU) building which has a gross floor area of circa 1,096sqm (including a mezzanine area of circa 69sqms) and a height of circa 10.2m. The RRU will have roof mounted solar panels. 6. Construction of a maintenance/workshop building with a gross floor area of circa 127sqm. 7. Construction of a new entrance for staff off the local road L8068 and security gates. HGV access will from the within the wider AFF facility. Agricultural access will be provided to the fields to the north west of the site at a point next to the proposed RRU building. 8. Provision of associated site infrastructure including electric vehicle parking spaces; cycle parking and shelter; connections existing services; hard and soft landscaping; boundary treatments; external site lighting. 9. Cycle parking will consist of 64 spaces for staff in a sheltered and secure parking area close to the proposed warehouse. 10. Car parking is located to the northwest of the existing manufacturing buildings and to the southern end of the proposed warehouse building. Parking will include 48 functioning EV spaces for cars. 11. Drainage infrastructure including separate foul and surface water drainage. Surface water drainage to include SUDS measures including an attenuation pond to the northern side of the proposed warehouse. The creation of a 60 metre wide biodiversity along the River Barrow on land to the north west of the warehouse including nature based SUDS measures including rain gardens and outfall to the River Barrow. 12. Amendment to PA Ref: 25/61064 to include the replacement of the swale granted under

New buildsCommercial & fit-outAgriculturalSite & groundworks+2
Kildare Co Co2661257Received 12/11/2026PERMISSIONSubmissions ~21d left

Former St. Paul's School lands , West End / Canal Harbour / Hopkins Mews / Hopkins Lane / St. Mary’s Lane , Monasterevin Co. Kildare

for a Discount Foodstore Supermarket with ancillary off-licence sales at former St. Paul's School lands, West End / Canal Harbour / Hopkins Mews / Hopkins Lane / St. Mary’s Lane, Monasterevin, Co. Kildare, W34 VX09. The proposed development consists of: Demolition of all existing former school buildings / structures and associated site clearance; Construction of a single storey (with mezzanine plant deck) Discount Foodstore (with ancillary off-licence use) with mono-pitch roof measuring c. 2,417 sqm gross floor space with a net retail sales area of c. 1,568 sqm; Reconfiguration / relocation of existing vehicular and pedestrian access point to West End to provide vehicular and pedestrian access and reconfiguration / relocation of existing vehicular and pedestrian access point to Hopkins Lane to provide pedestrian access only, associated modification of existing footpaths / public realm and associated accommodation works; New opening to and lowering of existing boundary wall along West End and part of Canal Harbour and St. Mary’s Lane (to accommodate new access and Foodstore façade), preservation / repair / alteration as appropriate of other sections of existing boundary wall, and replacement of existing boundary fence to Northern extent of site at Canal Harbour and Southeastern extents of site at Hopkins Mews / Hopkins Lane / St. Mary’s Lane and all associated and ancillary boundary treatment works; and, Site works and development including car parking (including electric car charging facilities), cycle parking, free standing and building mounted signage, trolley bay cover / enclosure, refrigeration and air conditioning plant and equipment, roof mounted solar panels, hard and soft landscaping, electricity sub-station building, works and connections to water supply, wastewater and surface water infrastructure and utilities, and all other associated and ancillary development and works above and below ground level. A Natura Impact Statement will be submitted to the planning authority with the application.

Extensions & renovationsCommercial & fit-outSite & groundworksRoofing, windows & external+3