An bóthar buí , Carraroe , Co. Galway
for demolition of substandard semi-detached flat and construction of a new semi-detached apartment in it’s place, along with connection to services and all ancillary works
Galway County Council and Galway City Council · latest application received 24/11/2026
for demolition of substandard semi-detached flat and construction of a new semi-detached apartment in it’s place, along with connection to services and all ancillary works
for the; 1.) Construction of 16 no. residential units comprising of: 4 no. 3- bedroom Terraced houses (Type 4), 4 no. 2-bedroom terraced houses (Type 3), 8 no. 2-bedroom apartments comprising of 2 blocks of 4 (Type 1 & Type 2), with 4 no. ground floor apartments and 4 no. first floor apartments being provided, each with their own door entrance. 2.) Access onto the existing Gleann Mhuiris estate access road and existing public footpaths 3.) Provision of parking, public and private open spaces, public lighting, landscaping and revised boundary treatments 4.) Connection to public mains and public sewer, together with all associated site works and services
for construction of 38 no. residential units to comprise of; 1 no. 2-storey apartment block containing 6 no. two-bedroom duplex apartments, 4 no. three-bedroom 2 storey terraced dwellings, 23 no. three-bedroom 2 storey semi-detached dwellings, 5 no. four-bedroom 2 storey semi-detached dwellings; demolition of the existing shed structures at the site; provision of a new vehicular and pedestrian access on to the N67 Ballyvaughan road (within the 60kmph speed limit), together with construction of a section of the Kinvara Inner Relief road (previously permitted under Pl. Ref. No. LA01/08); provision of a new footpath with public lighting from the proposed entrance along the southern side of the N67 to join up with the existing footpath to the front of the ‘Cnoc na nDealg’ housing estate to the east, with dropped kerbs at existing entrances, as well as a raised pedestrian crossing with belisha beacons to link with the existing footpath along the northern edge of the N67. The proposed pedestrian crossing will be located to the west of St. Josephs National School; provision of on-site carparking including EV charging spaces, and ducting to all spaces for future EV charging points; provision of public open space areas (including a play area), landscaping, private open space areas, groundworks, revised boundary treatments and an ESB substation; provision of a bin and bicycle store; connection to public watermains and sewer along the N67 together with the provision of an on-site pumping station; provision of surface water drainage arrangements to include on-site attenuation and infiltration, together with all ancillary site works and services. A Natura Impact Statement will be submitted to the planning authority with this application
of dwellinghouse, garage and an Independent Living Unit ancillary to the existing dwelling house and permission is being sought to upgrade the existing waste water treatment system and associated works
for the demolition of a substandard dwelling, storage shed and for the construction of four new terraced dwellings in a residential development. Permission is also sought for the sub-division of an existing site and for all associated hard & soft landscaped areas, site works and services
for partial demolition of the 4 no. existing apartments, including the demolition of the existing rear masonry wall to facilitate the proposed two-storey rear extension; removal and/or relocation of selected existing internal concrete block walls, internal stud walls and the existing staircase to facilitate the proposed revised internal layout; construction of a rear dormer to provide additional habitable accommodation within the existing attic space; elevational changes to all façades including removal of existing rooflight and the addition of 2 no. new rooflights, entrance doors, bay windows and changes to window positions; construction of a communal bin store serving the 4 no. apartments, together with new external storage areas and a plant room/battery store; construction of new hit-and-miss timber fence to the rear (west) side boundary of the site, including all associated ancillary and site development works
for a mixed use development of 9 no. residential units and 3 no. office units in 2 no. blocks and associated works as follows: (i) A 3 and 4 storey block incorporating the existing single storey office (originally permitted under Reg. Ref. 19/1872) containing 4 no. ground floor offices with 5 no. residential units over (4 no. 3 bed triplex units and 1 no. 2 bed duplex unit), and associated service plant room; (ii) The demolition of a part constructed but incomplete semi detached pair of houses (originally permitted under Reg. Ref. 18/556, as amended by Reg. Ref. 19/1019) and replacement with a 3 storey block of 4 no. residential units (2 no. 1 bed ground floor units and 2 no. 2 bed duplex units over); and (iii) all associated and ancillary development including drainage, landscaping and boundary treatments, and signage
Permission for development which consists of: We, Kuaile Touzi Limited, intend to apply for Permission for development at this site, Auburn Lodge, 1 Cruachan Park, Rahoon, Galway, H91 TH9D The Development will consist of (a) demolition of the existing dwelling and associated garage; (b) demolition/partial demolition of sections of the existing boundary wall to accommodate the proposed new parking layout and new site entrance; (c) construction of 3no. new three-storey terraced houses with dormers to the rear elevation; (d) alterations to the existing boundary walls, including an increase in the height of sections of the boundary wall; and (e) all associated ancillary and site development works and services
for construction of an extension to the existing house, for minor elevation & plan changes to the existing house, for supply and fit of new treatment system/septic tank and percolation area, for construction of a domestic garage/fuel storage, for retention of existing house on revised boundaries incl. all ancillary site development works associated with same on lands
for the demolition of an existing stone structure and the construction of two, one-bedroom apartments and associated site works