Lodged.

Dublin

Dublin City Council and Fingal County Council and others · latest application received 24/11/2026

88 received in 14 days · 163 in 30, so far
Gap in the data: Dublin City Council (latest we hold: 30/07/2026) has sent nothing recent to the national database, so applications there are missing here. Check that council's own website.
Showing the last 14 days. Subscribers get the weekly email, watched areas, history back to July 2026, building to 12 months, keyword filters and CSV export.Start free
South Dublin Co CoSD26A/0280WReceived 24/11/2026PermissionSubmissions ~42d left

15 Woodview Heights, Lucan, Co. Dublin, K78 W8C7

• Construction to the side of the existing dwelling of a detached 2 storey 2 bedroom house with home office • New vehicular entrance to Woodview Heights to serve proposed dwelling. • All associated site, boundaries, landscaping, drainage and ancillary works

New buildsCommercial & fit-outSite & groundworks
South Dublin Co CoSD26B/0517WReceived 20/11/2026RetentionSubmissions ~38d left

17 St John's Close, Clondalkin, Dublin 22, D22FH02

Retention permission for an existing detached garden room to the rear of the dwelling, incorporating a gym, WC and ancillary amenity space for use incidental to the enjoyment of the main dwelling house.

Extensions & renovationsCommercial & fit-outRetention
South Dublin Co CoSD26A/0276WReceived 18/11/2026RetentionSubmissions ~27d left

3-4 Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

Retention and permission for the completion of alterations to the permitted Energy Centre under Reg. Ref.:SD23A/0158, which arose during detailed design/ construction stage of the project: • Amendments to the permitted Air-Cooled Condensers (ACC) steel structure including changes to the shape of the condensers from a forced draft configuration (A-Frame) to an induced draft configuration (W-frame) resulting in an increase in overall height from c.25.4m to c. 26.8m; • Amendments to the permitted Air-Cooled Condensers (ACC) compound including the provision of an E-House room to the east of the compound and an additional Instrument Air (IA) apparatus to the south of the compound; • Amendments to the permitted Heat Recovery Steam Generators to include the relocation of the associated stacks and reduction in stack height from c. 33m to c. 29.6m; • Amendments to the permitted water treatment plant from a closed to an open structure and revisions to the overall layout comprising water treatment equipment within an open steel structure c. 20.8m in height; • The addition of a firewall between each individual gas/ steam transformer with a height of c. 4.4m located to the west of the site; • Amendments to the permitted MV/LV building to the south of the site to include an external plant area at second floor level; • The provision of a single storey switch gear room located to the south of the site with an overall height of c. 3.6m; • The provision of an additional fuel tank resulting in a total of 4 no. fuel tanks with an increased height of c. 18.1m; • Amendments to the permitted sprinkler tanks to include 1 no. singular sprinkler tank with an overall height of c. 13.4m and reconfiguration of the permitted fire pump room; • Amendments to the access arrangements on the northern and southern boundary, security fencing, reconfiguration of existing car parking to the south of the Power Trunk Building, the addition of a new swale in the west of the site, site lighting and all associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.

Extensions & renovationsCommercial & fit-outSite & groundworksEnergy: solar, batteries & grid+1
South Dublin Co CoSD26A/0275WReceived 16/11/2026PermissionSubmissions ~25d left

Caffrey's Confectionary Limited, Mulcahy Keane Industrial Estate, Greenhills Road, Dublin 12, D12 N273

(a) the subdivision of 1 no. Warehouse (3,086m2) to 2 no. Warehouses (No. 1 at 2716m2 and No. 2 at 370m2). (b) Associated Warehouse office, staff facilities, parking and bicycle parking. (c) New Signage. (d) All associated site works. (e) The Retention of modifications to the front facade including windows and doors.

Commercial & fit-outRoofing, windows & externalRetentionSignage & shopfronts
Fingal Co CoF26A/1009EReceived 16/11/2026PermissionSubmissions ~25d left

Unit 04 & 08, Donabate Shopping Centre, Main Street, Donabate, Co. Dub

The development will consist of the amalgamation of existing ground floor Cafe unit and commercial retail unit, and change of use to a singular consolidated Cafe unit, and replacement signage to the front elevation, and all associated site and ancillary works.

Commercial & fit-outRoofing, windows & externalSignage & shopfronts
Fingal Co CoF26A/1003EReceived 13/11/2026PermissionSubmissions ~22d left

Forrest Little Golf Club, Forrest Road, Fosterstown, Swords, Co. Dubli

The widening and realignment of the vehicular entrance to the club at Forrest Road, the demolition of the existing 'Pro Shop' and its replacement with a new 'Pro Shop' to the rear of the existing clubhouse, the construction of a two-storey course maintenance plant store with staff facilities above, with a wash bay and bypass interceptor, the construction of new sand storage bays and the realignment and relocation of internal fence lines to increase car parking for members and golf buggies.

Commercial & fit-outSite & groundworksDemolition
South Dublin Co CoSDZ26A/0030WReceived 12/11/2026PermissionSubmissions ~21d left

Units E&F, Block F, Townlands of Cappagh, Clonburris,, Dublin 22

The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ24A/0019W comprising in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows: Amalgamation of retail units situated at the ground floor of Building Block F – retail Unit E (circa 130m2) and retail Unit F (circa 95m2) to become one retail unit (circa 225m2) Relocation of the existing main entrance of retail Unit E. Shopfront Signage associated with the amalgamated Units E&F.

Commercial & fit-outSite & groundworksSignage & shopfronts
Fingal Co CoF26A/0993EReceived 11/11/2026PermissionSubmissions ~20d left

Well Road, School Lane, Swords, K67Y935

The development will consist of change of use of an existing 2 storey brewery building known as the Chalk Bar to a hotel now 3 storey building with 24 ensuite bedrooms, to the south of the existing Old Schoolhouse Bar & Restaurant (Protected Structure) on the adjacent site. The development is not part of the original protected structure site. The existing drainage system already installed will be improved to deal with the foul and surface water drainage on site. The proposed works include a revised vehicular entrance, boundary treatment and changes to the existing building that include some demolition work. Alteration to all elevations to include glazed curtain walling bay details, limestone fenestration and an additional storey extension and a lift enclosure and additional site works, all to make the building compliant with up to date building regulations.

Extensions & renovationsCommercial & fit-outSite & groundworksRoofing, windows & external+1